Resolved, and now being watched so it does not simply happen again.
A large section of the privately run Binaliw sanitary landfill collapsed past 4 p.m. on 8 January 2026, burying workers and structures; 36 people died and 18 were injured. MGB-7 traced the primary cause to oversaturation of the waste mass after weeks of rain, with waste piled about 35 metres high on steep slopes. DENR-7 issued a cease-and-desist order against operator Prime Integrated Waste Solutions, forcing Cebu City to haul its garbage 61 km to Aloguinsan. On 19-20 August 2026 the DENR lifted the order with conditions, including a cap of 500 metric tons of residual waste per day, CCTV, a buffer zone and continued slope stabilisation.
This case is documented in public reporting. Every fact on this page comes from the sources below, which are kept against the case so the record can be checked.
The Freeman (Philstar) · Jan 13, 2026
InsiderPH · Aug 25, 2026
Every change of state, timestamped, oldest first. Entries are added, never edited or removed, so the record of how long something took cannot be quietly improved later.
A large portion of the Binaliw landfill collapsed past 4 p.m., burying workers and structures.
Recorded by Prime Integrated Waste Solutions / Cebu City
Joint inspection found oversaturation of the waste from continuous rainfall as the likely primary cause.
Recorded by MGB-7, EMB-7, Cebu City ENRO
Cease-and-desist order issued against the operator, halting all landfill operations except rescue and cleanup.
Recorded by DENR Region 7
Closure order fully lifted with conditions: 500-metric-ton daily cap, CCTV, buffer zone and a multipartite monitoring team.
Recorded by DENR Central Visayas
The measured result
Taken on a return visit after the work was done, not estimated on the day.